Peat Harvesting Machine

Teva peat harvesting machine in for repair. Gearbox stripped and new gears, bearings and seals sourced and fitted.  Steel work needle-gunned and heavily corroded areas removed and replated. Wear zone of Auger rim re-engineered.  Cutting bar stripped and re-built with heavy duty steel plates. Painted to customer specification on completion.  

  • Auger for peat machine in for overhaul

    Auger for peat machine in for overhaul

  • Peat machine gearbox being stripped

    Peat machine gearbox being stripped

  • Cutting chain guard removed for re-engineering

    Cutting chain guard removed for re-engineering

  • Cutting chain guard removed for re-engineering

    Cutting chain guard removed for re-engineering

  • The machine all ready to go back to the peats

    The machine all ready to go back to the peats

Back to top ^
News Headlines

E10 Fuel to Replace Petrol - what does it mean for you and your vehicles?

This month sees the introduction of E10 fuel to replace the old E5 standard. The new fuel contains a higher percentage of renewable bioethanol (10%, u Full Story...

Back to where it all began......

Back in the early 1970s, when Precision Engine Services was first established, my father and mother - Len and Helen Morrison - built their first Full Story...

Opening Hours:

Monday - Thursday: 0730-1700

Friday: 0730-1500

Precision Engine Services, 23 Henderson Drive, Inverness IV1 1TR

Tel: 01463 235537 Email:

Precision Engine Services Limited Registered in Scotland No: SC399507
Registered Office: 23 Henderson Drive, Inverness IV1 1TR.

website by plexus media